PORDUCTS LIST

QUALITY
QC Staff :

2
Procedures/testing Details:

1. Material control from raw materials. Only after material testing, 

the raw materials can enter into our factory. Any property mistakes 

would be rejected.

2. Sand hole inspection after raw materials are machining before polishing.

3. For each valve, pressure testing and temperature testing is required. 

4. After we get the finished products, we check for the surface roughness

thickness equality, roundness, size measurement and sand holes again.

The checking quantity is not less than 10% of total quantity.

5.For SS316L grade materials, 100% recheck the chemical components again before shipment.

6. Before shipment, we check for the quantity of each product in order to 

find out any missing quantity or wrong product.

7. Finally, we use strong package to prevent the products from any damages.


  • test

  • test

  • test

  • test

  • test

  • test

  • test

  • packing

  • packing

  • packing